Beijing Xinjunjie Building Materials Factory
Powerful Stall4yearsOS 4

Subway sprayed concrete slope stabilization and rapid setting material building repair and reinforcement, new hero

$28.57
Reference Price
1ton (Min. Order)
unit
ton
Negotiable
Ship From
Beijing
Shipping
To be negotiated with the supplier
Customization
For customization requests, please
Brand
Beijing Xinjunjie Building Materials Factory
Spray nozzle distance
0.6m~1.5m
Water reducing agent dosage
0.9%
Construction method
Wet spray dry spray selection
Waterproof layer resistant to salt spray
strong
Spray sequence
bottom-up
Corrosion resistance
corrosion resistance
Mixing method
forced mixer
Scope of application
Tunnels, underground engineering, etc
Storage requirements for mixed materials
Rainproof and waterproof
Delivery method
Compressed air delivery
Dust content
≤2mg/m³
Rebound rate control
Side wall ≤ 15%/arch ≤ 25%
Construction speed
Efficient construction
Waterproof layer resistant to ultraviolet rays
stable
Details













Price Disclaimer
  • Price:The price shown on Aicaigou (foreign currency prices use an estimated exchange rate) is a reference. The final price may change due to promotions, quantity, or specs. For offline transactions, the mutually agreed price prevails; for online orders, the price is as shown at checkout.
  • Note:Promotional prices shown on the product page are for specific periods only.The final price is either the checkout total or what you agree with the merchant.If you see an issue with a price or deal, contact the merchant before buying.
Important Notice
  • The above product information is provided by BAIDUAICAIGOU, who are responsible for its authenticity, accuracy, and legality.
  • Should any issues arise regarding a product, please contact the third-party for its removal. Aicaigou will actively assist and cooperate in this process.
  • During trade, please diligently verify all credentials of your business partners to prevent fraud.
Inquiry
Chat Now
WhatsApp