Photos
Attributes
Temporary support structure foundation pit support structure support system construction with short construction period
$14.29 / square meter
Reference Price1square meter (Min. Order)
Ship From
Beijing
Shipping
To be negotiated with the supplier
Customization
For customization requests, please
Ask us in WhatsApp:
Scan the QR code
Product Recommendations
Key Attributes
Details
Price Disclaimer
Brand
Longjun Construction
Support type
Reverse arch wall
Maintenance Method
regular inspection
Quality
Reliable
Material Type
Reinforced concrete
Applicable Geology
sandy soil
Construction method
Cast in place pile
service life
Temporary support
Application scenarios
Tunnel foundation pit
construction period
7-15 days
Support height
1m~5m
Scope of Services
Region
Details
Price Disclaimer
- Price:The price shown on Aicaigou (foreign currency prices use an estimated exchange rate) is a reference. The final price may change due to promotions, quantity, or specs. For offline transactions, the mutually agreed price prevails; for online orders, the price is as shown at checkout.
- Note:Promotional prices shown on the product page are for specific periods only.The final price is either the checkout total or what you agree with the merchant.If you see an issue with a price or deal, contact the merchant before buying.
Important Notice
- The above product information is provided by BAIDUAICAIGOU, who are responsible for its authenticity, accuracy, and legality.
- Should any issues arise regarding a product, please contact the third-party for its removal. Aicaigou will actively assist and cooperate in this process.
- During trade, please diligently verify all credentials of your business partners to prevent fraud.
