Beijing Longjun Construction Engineering Co., Ltd
OS 4

Reinforcement of foundation pit slope and deep foundation pit support scheme with high engineering safety guarantee and safety factor

$14.29 / square meter
Reference Price
1square meter (Min. Order)
Ship From
Beijing
Shipping
To be negotiated with the supplier
Customization
For customization requests, please
Structural form
Pull anchor type
response speed
fast
Support type
Reverse arch wall
Applicable Geology
sandy soil
Construction method
Cast in place pile
Cooperation Model
Integrated design and construction
security level
Level 3
design standards
landmark
Application scenarios
Tunnel foundation pit
Quality
Reliable
construction period
7-15 days
Material Type
Reinforced concrete
Details







Price Disclaimer
  • Price:The price shown on Aicaigou (foreign currency prices use an estimated exchange rate) is a reference. The final price may change due to promotions, quantity, or specs. For offline transactions, the mutually agreed price prevails; for online orders, the price is as shown at checkout.
  • Note:Promotional prices shown on the product page are for specific periods only.The final price is either the checkout total or what you agree with the merchant.If you see an issue with a price or deal, contact the merchant before buying.
Important Notice
  • The above product information is provided by BAIDUAICAIGOU, who are responsible for its authenticity, accuracy, and legality.
  • Should any issues arise regarding a product, please contact the third-party for its removal. Aicaigou will actively assist and cooperate in this process.
  • During trade, please diligently verify all credentials of your business partners to prevent fraud.
Inquiry
Chat Now
WhatsApp